
Defrost Timer
The WP68233-3 is a defrost timer for Whirlpool refrigerator. Basic tools needed. Compare prices from top sellers.
Replaces: 1356, 63001580, 66556-8, 68233-2, 68233-3, 69543-4, 69543-6
Moderate Repair
Does this part fit my model?
Need help?Price Comparison
4 stores · Updated May 17, 2026$116.49
4.5(13.6k)In Stock
Go to Store$116.50
4.8(21.9k)In Stock
Go to Store$96.28
4.8(728)Preorder
Go to Store$122.31
4.4(3.1k)Preorder
Go to StoreThe Refrigerator Defrost Timer manages the automatic defrost cycle in your appliance’s freezer compartment. If the timer isn’t advancing like it should or triggering your freezer to enter defrost mode, the part could be broken and need replacement. This part is designed for continuous or cumulative run defrost systems; refer to the included installation instructions to properly install this part in your specific model. Note that this part does not include the defrost timer knob. Installing this part will require basic hand tools, some disassembly of the dishwasher and novice repair experience. Remember to unplug the refrigerator or shut off the house circuit breaker for the appliance before installing this part.
Part Specification
• This product is a Factory Certified Part. These three words represent quality parts and accessories designed specifically for your appliance. Time tested engineering that meets our strict quality specifications
• This product is a replacement part
• Package contains (1) Refrigerator Defrost Timer
• Tools Needed: Multi screwdriver
Part Specification
• This product is a Factory Certified Part. These three words represent quality parts and accessories designed specifically for your appliance. Time tested engineering that meets our strict quality specifications
• This product is a replacement part
• Package contains (1) Refrigerator Defrost Timer
• Tools Needed: Multi screwdriver
0 reviews
Common Problems This Part Fixes
Freezer not defrosting
Fridge runs too long
Repair difficulty: Moderate - basic tools and 1-2 panels to remove
Loading models...