Model
Kenmore 253.54639500
Refrigerator (Kenmore 25354639500)
Parts Sections (9)

How to find your part
Find part on diagram
Zoom in & tap a highlighted area
Tap "Parts" tab
Switch to the parts list view
See details & prices
Your selected part is highlighted
ModelKenmore
253.54639500Refrigerator (Kenmore 25354639500)
9 diagrams315 parts
Parts Sections (9)
Diagram
CONTROLS

Parts in CONTROLS
29 parts
| Ref | Image | Part / Description | Best Price |
|---|---|---|---|
| 5 | Refrigerator Evaporator Fan Blade | $28.91 Part Advantage | |
| 8 | Ikea Refrigerator Evaporator Fan Shaft Washer | $13.13 Parts Dr | |
| 9 | Refrigerator Evaporator Motor Mount Bushing | $12.63 Parts Dr | |
| 13 | 5303918549replaces 240369702 Refrigerator Evaporator Motor | $41.09 Part Advantage | |
| 14 | 242135301replaces 241517701 Refrigerator Clip | $6.48 RepairClinic | |
| 15 | 316538904replaces 241555401 Refrigerator Light Bulb | $9.61 Part Advantage | |
| 16 | 218906802replaces 241513901 Light Socket | $10.24 Part Advantage | |
| 17 | Refrigerator Control Box | - | |
| 18 | ![]() | 240360801NLA Refrigerator Temperature Control Knob | Discontinued |
| 21 | 241537104replaces 241586501 Refrigerator Thermostat | $111.86 Part Advantage | |
| 21A | 5304496561replaces 5304421067 Refrigerator Temperature Control | $80.91 Part Advantage | |
| 22 | 218660704replaces 218660702 Insulation Tube | - | |
| 23 | 241508001NLA Refrigerator Adaptive Defrost Control Board Kit | Discontinued | |
| 53 | ![]() | Crosley Refrigerator Electronic Control Board Housing | - |
| 81 | 5304455650replaces 5308016566 Refrigerator Evaporator Fan Mounting Bracket Screw | $10.31 Parts Dr | |
| 101 | Screw-hex Hd | - | |
| 115 | Crosley Refrigerator Air Damper Control Assembly | $134.84 Part Advantage | |
| 137 | Refrigerator Water Filter Wrench | $2.66 Part Advantage | |
| 137 | WFCBreplaces 9910 Genuine Kenmore Refrigerator Water Filter | $25.07 Parts Dr | |
| 138 | Refrigerator Water Filter Cup O-Ring | $7.48 Part Advantage | |
| 138 | 240434401replaces 240434403 Refrigerator Water Filter Cap | $43.88 Part Advantage | |
| 139 | Refrigerator Water Filter Housing | $43.04 Part Advantage | |
| 140 | Refrigerator Water Tube Fitting | $42.65 Part Advantage | |
| 149 | 241528303replaces 241528306 Refrigerator Seal | $14.99 Parts Dr | |
| 149 | 242204506replaces 241563501 Fan Shroud | $34.19 Parts Dr | |
| 150 | ![]() | 240394102NLA Refrigerator Water Filter Cover Insulation | Discontinued |
| 151 | Refrigerator Water Filter Cover | - | |
| NI | Refrigerator Wire Harness | - | |
| NI | 5304455649replaces 5303001259 Refrigerator Screw | $12.95 ApplianceParts Pro |


